Construction Management
|

Construction (Basement) of Citraland Liang Court Project
- Jakarta
We
offer a full array of construction management, inspection and support services. Our clients
include government and private agencies, as
well as commercial and industrial institutions.
We assume a proactive approach to actively anticipate potential problems and develop solutions before the program is
adversely impacted, which provide the owner the ability to maintain schedule,
cost and quality.
Professional Staff: Experienced engineers, cost specialists, inspectors and
technicians provide construction support services for highways, bridges,
utilities and transit facilities, commercial and industrial buildings,
environmental projects and other public works projects. In the field, our
support teams reporting to job sites are equipped with state-of-the-art surveying,
inspection
and testing instruments along with the necessary understanding of project needs
and regulatory requirements.
Accurate and Timely Documentation:
Our project managers and office engineers utilize computerized documentation
systems to accurately record meeting minutes, proposed changes, shop drawing
logs, daily reports, quantities and non-conformance items, as documentation
is critical for a well-organized project and for claims avoidance and defense.
Schedule Expertise: Utilizing the scheduling software most appropriate for the
project, our project managers analyze the contractor's CPM in accordance with
the contract documents, evaluate the logic and compliance with critical
milestones and evaluate the adequacy of the contractor's resources. The
approved CPM is then utilized to review the schedule of values and to assess
construction status.
Estimating Specialists: Cost control starts at the concept phase when the
owner's budget is reviewed to determine its compatibility with the scope and
schedule. During the design phase, our estimators produce independent estimates
using computerized estimating systems, and verify the A/E's compliance with the
original program. Change orders proposed during construction phase are analyzed and
comparative estimates are prepared.
Our Mission: While the services provided consist of many individual tasks, our
ultimate mission is to manage the owner's schedule and budget,
and to control quality. We perform as the owner's representative in a partnering
atmosphere, because the most successful projects are those with open
communication and proactive decision making.
|
|
|
|
Our
project experience includes the following:
-
Anggana
Danamon Project -
Jakarta (year 1994 - 1996); A Twin Office Building of 32 story,
period with 3 levels of basement; Owner:
Danamon Land - Jakarta
-
Tomang
Flyover (West Side Extension) Project,
Jakarta (year 1995 - 1998); A Prestressed - Cast in place - Concrete
Bridge (2 lanes) consisting of 5 spans, totaling
222.25 m in length, erected on precast concrete driven piles, this project
is financed by Mulia Inti Pelangi - Jakarta; Owner: The Public Work
Section of Jakarta Municipality
-
Citraland
Liang Court Project,
Jakarta (year 1994 - 1996); A Twin Tower Apartment of 24 story, provided
with 2 levels of basement; Owner: Ciputra Adigraha Jakarta
-
West
Lampung Emergency Reconstruction Project
- Sumatera (year 1995 - 1997); Consisting of a multidiscipline project
construction supervision: 63 units of Elementary Schools, 6
units of Primary High Schools, 2
units of Secondary High Schools, 1
unit of Traditional Market,1 unit of Bus Station/Terminal, 17
units of Health Centres and Sub Health Centres, 140
m of Prestressed Concrete Bridges, 55
km of Provincial Roads; This
project is partially financed by the Asian Development Bank (ADB); Owner
: The Government of Lampung Province.
-
Dukuh
Atas Underpass,
Jakarta (year 1993 - 1994); A double cells Precast RC Vehicular Box,
pushed in place by a system of Hydraulic Jacks; The
Underpass is located underneath the ever crowded exising arterial road.
The work; includes
construction of ramps, sumpit plus submersible pumps installation,
lighting system & landscape;
This project is financed by a consortium of companies namely Landmark,
Indocement Tunggal
Perkasa & Yayasan Dapenso BNI 1946; Owner: The Public Work Section of
Jakarta Municipality
-
Padalarang
- Cileunyi Toll Highway Project,
West Java (year 1987 - 1992); The first long distanced Rigid Paved Toll
Highway constructed in Indonesia; Divided into 2 construction section,
financed partially under the loan of Saudi Fund For Development
(SFD) and Kuwait Fund for Arab Economic Development (KFAED); The physical
project feature is as follows: 35.6
km four lanes of Main Highways (rigid pavement),16.7 km four lanes of
Connections and Access Roads (rigid pavement), 31.2
km double lanes of Frontage and Local Roads (flexible pavement), 7
numbers of Road Interchanges & 25 numbers of Precast RC - Pedestrian
Bridges; 22 numbers of
Precast RC - Road Under/Overpass; 109
numbers of Cast in Place RC Vehicular/Waterways/Pedestrian Boxes; 470
numbers of Precast RC Pipe Culvert Systems; 9
numbers of Toll Plazas
|
|
| Please Click Images
below for enlarged sized

Angsana
Danamon - Jakarta

Movenpick Hotel - Jakarta

Const. Basement of
Citraland Liang Court Project

Dukuh Atas Underpass

Padalarang Cileunyi Toll
Road |
|
|
Contact
the Webmaster with questions
or comments regarding this site
Copyright
© 2007, Wiratman & Associates. All rights reserved |
|
|