Offshore
Drilling in Tan Shui Port Project - Taiwan;
Core Drilling (18 holes; 400m); Client/Owner: Somesha Geoscience - Singapore;
1999.
Geotechnical
Investigation for NW Segment Expansion Project for Gathering Station VI -
Minas; Core
Drilling (5 holes; 150m); Client/Owner: PT Caltex Pacific Indonesia; 1998.
Geotechnical
Investigation for Potential Casting Basin Sites in Timor;
Core Drilling in West Timor (5 holes; 150m) & East Timor (16 holes;
640m ; Client/Owner: BHP Petroleum Pty. Ltd.; 1997.
Geotechnical
Investigation for Nitric Acid and Ammonium Nitrate Plant Project - Bontang;
Core Drilling (14 holes; 570m), Pressure Meter Test and other related
test; Client/Owner: PT Tridaya Esta Kimia; 1997.
Geotechnical
Investigation for Tanjung Jati B. Coal Fired Power Plant Project - Central
Java; Core Drilling
(20 holes; 797m) with Pressure Meter Test; Client/Owner: PT Cepa
Indonesia; 1996.
Geotechnical
Investigation for BDNI Center Office Building;
Client/Owner:
PT Sentra BDNI Development; 1996.
Preliminary
Geotechnical Investigation for Jakarta Mass Rapid Transit System Project
Blok M - Kota Phase-1;
Core Drilling (52 holes; 2320m) with related In-situ Test; Client/Owner:
Joint Working Group; 1996.
Geotechnical
and Geological Investigation Works for Pandanduri Swangi and Mujur
Dams; Core Drilling
(33 holes; 880m) with Pressure Meter Test; Client/Owner: Mott McDonald; 1995.
Geotechnical
Investigation Works for Gunung Salak Geothermal Power Plant Extension
Project; Core
Drilling (3 holes; 140m) and Plate Bearing Test; Client/Owner: Ansaldo -
Italia; 1995.
Geological
and Geotechnical Investigation for Larona Hydroelectric Power Plant
Project; Core
Drilling (12 holes; 600m) and Seismic Refraction 4 Km; Client/Owner:
Pacific Rim Power; 1995.
Geotechnical
Investigation Works for Infrastructures at Batu Hijau Gold Mine Project;
Core Drilling (34 holes; 1360m) and Seismic Refraction 4 Km; Client/Owner:
Golder Associates - Canada;1995
Geological
Survey for Hydro Potential Study of Sumatera Island;
Client/Owner: Electric State Company (PLN); 1994
Drilling
and Grouting Works for Chandra Asri Petrochemical Project; 1993
Dewatering
Works for Mega Pasaraya Mall Projects;
Owner/ Developer: PT Pasaraya Toserba Jaya;1993
Pumping
Test for Bonvest Hotel and Apartments Project;
2 Test wells & 10 observation wells; 1993
Natural
Condition Surveys in Ports of Kupang and Bitung for Study on Integrated Modernization
Plan for Sea Transportation in Eastern Indonesia;
Offshore Core Drilling (4holes; 160m) Depth of sea bed down to 15 m;
Client/Owner: Directorate of Sea
Communication;1993.
Geotechnical
Investigation for Lombok Tourism Development Project Putri Nyale Resort;
Core Drilling (13holes; 265m) and other in-situ testing; Owner/ Developer:
PT Lombok Tourism Development Corp.;1993
Offshore
Drilling for Geotechnical Investigation of Purified Telephetaric Acid
Merak phase II; Offshore
Core Drilling (12hole; 360m) depth of sea bed down to 15 m; Client/Owner:
Bakrie - Kasei;1993
Geotechnical
Investigation for Integrated Musi Bridge Project - Musi Refinery;
Core Drilling
(10hole; 504m) and other in-situ testing; Client/Owner: Pertamina;1993
Deep
Well Construction for Supporting Facilities of Singkarak HEPP;
Client/Owner:
Dumez; 1992
Geotechnical
Investigation for Proposed Double Track Railway Cisomang - Rendeh Project;
Core drilling (23 holes; 245m); Client/Owner:
Perumka; 1991
Offshore
and Onshore Geological and Geotechnical Investigation Works for Paiton
Steam Power Plant Project;
34 offshore drilling & 3 Onshore drilling; Client/Owner:
Obayashi Corp. - Japan;
1991
Routine
Geotechnical Investigation for Subsoil Improvement Works - Balongan EXOR
II Project;
Plate Bearing Test, Sand Cone Test and Drilling; Client/Owner:
Penta Ocean - Japan;
1991-1993
Geotechnical
Investigation for Cikampek - Padalarang Toll Road Project;
Core drilling (62 holes; 1455m), Borehole In-situ Testing, Plate Bearing
Test; Client/Owner: Rendel Palmer &
Tritton; 1990
Underground
Geotechnical Investigation for Lot D1 Investigation Adit of
Singkarak HEPP;
Core drilling in Adit (12 holes; 547m), Convergence Measurement (6 nos),
X-hole & Down Hole Seismic Survey, Flow Measurement; Client/Owner:
Electric State Company (PLN);
1990
Geotechnical Investigation for
Bukit Asam Telecommunication Towers Project;
Core drilling (19 holes; 325m) Pressure Meter Test, Vane shear Test and
Lab. Test; Client/Owner: Golder
Associates; 1986
Geological
and Geotechnical Investigation Works for Detail Design Stage of Mrica HEPP;
Trial Embankments, Grouting Test, Core drilling and Pressure Meter Test;
Client/Owner: SWECO - Swedia; 1984
Offshore
and Onshore Geological and Geotechnical Investigation Works for Paiton
Steam Power Plant;
Core drilling (18 holes; 830m) with max. depth 80m, coupled with borehole
in-site testing such as Pressure Meter Test, Vane Shear Test and Lab.
Test; Client/Owner: Electric State
Company (PLN); 1984